Original document(10 pages) Authorized document(11 pages) 中文版
    The co-combustion process may comprise the following unit operatinos: routing of hot gas generated in the clinker cooling process to a rotary kiln; use of part of the rotary kiln exhaust gas to dry solid wastes in rotary dryers; leading the gases from both the dryer and the combustion kiln to the secondary combustion chamber; use of additinoal fuel to boost up the secondary combustion chamber reaction temperature to as high as 1200 °C; primary dry gas scrubbing in a precalciner or precalciners; heat recovery and power generation; secondary gas scrubbing in a semi-dry scurbber; bag filtering after activated carbon injection and returning of all the collected ash and used carbon into the waste kiln and/or a cement kiln. Detrimental materials for cement processing generated by waste combustion can be by-passed to a scrubbing system and a cement.
Application Number
申请号
01804541 Application Date
申请日
2001.02.05
Title 名称 Method and process for co-combustion in waste-to-energy facility
Publication Number
公开号
1398336 Publication Date
公开日
2003.02.19
Approval Pub. Date Granted Pub. Date 2005.06.08
International Classification 分类号 F23G5/00,C04B7/44
Applicant(s) Name
申请人
Green Island Environmental Tech Co Ltd
Address 地址
Inventor(s) Name 发明人 Leung Chingchiu, Khine Aung
Attorney & Agent 代理人 chen changhui
More information 更  多  信  息


 Related patents information
Google
Note:All patent data come from State Intellectual Property Office of the People's Republic of China. If there were discrepancies between here and the State Intellectual Property office, the later is more accurate. The patent data is only for public exchange and learning purposes. We are not responsible for the adverse consequences with unverified use of the data.