| Original document(5 pages) Authorized document(6 pages) 中文版 |
The dry ice cleaning process of convection chamber furnace tube includes opening manhole to the wall of chamber, spreading scale, collecting article in each layer, connecting to the dry ice cleaning system regulating dry ice and compressed air amount based on dirt condition, and spraying and cleaning the furnace tube with dry ice sprayer and eliminating ash from the top to bottom. The dry ice cleaning process has no damage to tube wall and furnace, and produces no secondary pollution and has obvious cleaning effect. The present invention solves one difficult problem in petrochemical industry. |
Application Number 申请号 |
02132314 |
Application Date 申请日 |
2002.08.26 |
| Title 名称 |
Dry ice cleaning method for convection chamber pipes of fuel oil heating furnace |
Publication Number 公开号 |
1399118 |
Publication Date 公开日 |
2003.02.26 |
| Approval Pub. Date |
|
Granted Pub. Date |
2004.09.08 |
| International Classification 分类号 |
B08B5/00,F28G9/00 |
Applicant(s) Name 申请人 |
Xiamen Hefengli Dry Ice Decontaminating Equipment Co., Ltd. |
| Address 地址 |
361022 |
| Inventor(s) Name 发明人 |
|
| Attorney & Agent 代理人 |
ma yingsen |
| More information 更 多 信 息 |
|
| Related patents information |
|
|
|
|
|
|