Original document(3 pages)  中文版
    The present invention relates to an auxiliary construction process for treating foundation soil with high water content by utilizing dynamic consolidation method. It is characterized by that in the high water-content foundation soil interior firstly the quicklime or other water-absorbing material can be used, and made into the uniformly-distributed lime-soil piles or lime-soil piers, then the dynamic consolidation process can be made.
Application Number
申请号
200610115872 Application Date
申请日
2006.08.14
Title 名称 Strong rammer treatment high-water content foundation soil auxiliary construction process
Publication Number
公开号
1932168 Publication Date
公开日
2007.03.21
Approval Pub. Date Granted Pub. Date
International Classification 分类号 E02D3/12;E02D3/046
Applicant(s) Name
申请人
Mao Xinyan
Address 地址
Inventor(s) Name 发明人
Attorney & Agent 代理人
More information 更  多  信  息


 Related patents information
Construction technique of static pressure treatment for ground base and pile foundation
Heavy ramming technology for processing deeper foundation
Rammer piling and adding procedure in foundation treatment process with dynamic consolidation
Google
Note:All patent data come from State Intellectual Property Office of the People's Republic of China. If there were discrepancies between here and the State Intellectual Property office, the later is more accurate. The patent data is only for public exchange and learning purposes. We are not responsible for the adverse consequences with unverified use of the data.